Takeoff
Run a real estimate before you call.
Piece-count takeoffs priced from September 2026 Ellis County / south DFW unit rates — delivered Ready-Mix, lumber-yard material, and open-shop labor from Waxahachie to Ennis. Quantity × rate, materials vs labor. Soil, access, and finish still move the number.
Area prices
What we price from.
September 2026 contractor unit prices for Ellis County and south DFW — delivered job-site cost, not a big-box shelf tag. Open-shop labor. Used on every takeoff below.
Waxahachie · Ennis · Midlothian · Red Oak
Concrete
- Ready-mix 3000 PSI, delivered/ cu yd$207–$245
- 4 in crushed limestone base/ sq ft$1.19–$2.03
- Place, screed & finish/ sq ft$3.71–$5.74
- Pump truck/ job$630–$1,190
Drywall
- 1/2 in 4×8 sheet, delivered/ sheet$18.55–$23.10
- Hang labor/ sq ft$0.77–$1.26
- Tape & Level 4 finish/ sq ft$1.26–$2.10
Framing
- 2×4 stud, job-site/ ea$5.53–$8.19
- 7/16 OSB 4×8/ sheet$16.80–$23.10
- Wall framing labor/ sq ft$4.55–$7.35
- Roof truss package & sheathing/ sq ft$6.65–$11.20
Pipe fence
- 2-3/8 in × 8 ft post/ ea$22.40–$33.60
- 1-7/8 in rail, 21 ft stick/ stick$50.40–$81.20
- Set, weld & paint labor/ lf$10.50–$16.10
- Pipe gate, installed/ ea$910–$1,960
Formed, reinforced, placed, and finished. House slabs get vapor barrier, rebar, and PT cables or thickened beams. Pump added over 8 cu yd. Short-load surcharge under 5 cu yd. Ready-mix at September 2026 DFW delivered price.
Estimate
Concrete slab
Elite Custom Framing & More, LLC · Unit prices: Ellis County / south DFW, September 2026.
$14,469–$21,620
$10–$14 / sq ft
Not a bid. Site visit required before we write a number we will stand on.
Request a quote